| Click here to visit my 2006 2007 2008 blog | ||
|
06.12.06
|
This is the last entry for this gallery and I will open a new one for the wings kit
|
![]() |
|
05.12.06
|
fiinished the elevator trims and with that the empennage kit at this stage
|
![]() |
|
03.12.06
|
The Tailcone is ready for inspection. I am finishing now the trims.
|
![]() |
|
29.11.06
|
The afterdeck is riveted and the topskin is clecoed to the frame and stiffeners
|
![]() |
|
24.11.06
|
The skins are riveted. I managed to do this by myself so far but I found 4 rivets where I will require some help.
|
![]() |
|
23.11.06
|
The tailcone is comming together. But it looks like I will need another pair of hands since I can´t reach some rivets.
|
![]() |
|
22.11.06
|
All parts are primed now. I started riveting, today. I am working now 10 hours a day, yes I took vacation to complete the tailcone in time.
|
![]() |
|
21.11.06
|
I started to prime the parts. In other words the majority of deburring, dimpling and scuffing is done.
|
![]() |
|
20.11.06
|
Now the "boring" work started. Deburring, dimpling / countersinking of all the holes which I drilled before. I need to be finished with the tailcone this week, because the wings will be delivered end of the month.
|
![]() |
|
2.11.06
|
My parents viseted my workshop for the first time
I made good progress on the tailcone |
![]() |
|
21.10.06
|
It was a great day I went flying in the early afternoon and spend the evening in the workshop.
Lots of progress on the tailcone as you can see! |
![]() |
|
15.10.06
|
I finished the left elevator, i ran out of plindrivets so the right elevator will be finished once I receive them. The trims still need to be completed I need tank sealant to proceed.
To keep the momentum and make use of the waiting time I started with the tailcone. |
|
|
07.10.06
|
I glued the trailing edges of the elevator with tank sealant
|
![]() |
|
29.09.06
|
HORIZONTAL STABILIZER
and RUDDER ARE FINISHED Much progress on the Elevators |
|
|
18.09.06
|
I started to rivet the skin to the structure.
I uploaded the YAK-18T videos. Check out the Movie section (quicktime required) |
![]() |
|
11.09.06
|
I continued to work on the elevator
|
![]() |
|
14. - 18.08.06
|
Vacation in Lithuania
YAKOVLEV YAK-18T demo flight Visiting YAK maintenance companies |
![]() |
|
12.08.06
|
HORIZONTAL STABILIZER
ready for inspection. Started the ELEVATOR |
|
|
11.08.06
|
I started to rivet the skins to the frontspar assembly.
|
![]() |
|
29.7.06
|
Assembly of the Horizontal Stabilizer started
|
![]() |
|
26.7.06
|
HS assembly matchdrilled. Both skins deburred and dimpled, ribs and stiffeners deburred, dimpled, scuffed and primed
|
![]() |
|
19.7.06
|
Horizontal Stabilizer ready for match drilling
|
![]() |
|
14.7. - 16.7.06
|
Weekend trip to Europes biggest Fly-In
Tannkosh 2006 |
![]() |
|
13.7.2006
|
I finished priming and riveting the HS spars
|
![]() |
|
1.7.2006
|
My wifes first flight lesson
|
![]() |
|
10.-11.06.´06
|
Weekend trip to Locarno (LSZL)
|
![]() |
|
04.06.2006
|
I also started with the horizontal stabilizer today.
|
![]() |
|
04.06.2006
|
Today I completed the rudder, it is ready for inspection now.
|
![]() |
|
25.05.2006
|
Back riveting rudder stiffeners. Glueing the rudder trailing edge
|
![]() |
|
21.05.2006
|
I primed all rudder parts and riveted the bottom rib
|
![]() |
|
20.05.2006
|
The Vertical Stabilizer is completed VS.
|
![]() |
|
18.05.2006
|
Structure is completed. Started to rivet the skin. My building advisor checked my work and I got the go ahead to close the VS.
|
![]() |
|
09.05.2006
|
Priming of the Vertical stabilizer completed and first rivets set.
|
![]() |
|
2.05.2006
|
As promised here are some pictures of my new workshop
|
![]() |
|
22.02.2006
|
Good News! I managed to find a workshop which meets my requirements. Will add pictures once I move in.
|
|
|
18.02.2006
|
![]() |
|
|
24.01.2006
|
Matchdrilled the skin to the VS skeleton and started to dimple
|
![]() |
|
22.01.2006
|
IClecoes the spars and ribs of the vertical stabilizer
|
![]() |
|
17.01.2006
|
Started to build the vertical stabilizer
|
![]() |
|
13.12.2005
|
Here the two crates arrive after a long air travel all the way from Vansaircraft, Aurora, Oregon to lovely Zurich, Switzerland
|
![]() |
|
9.-10.12.2005
|
I finished my workbench
|
![]() |
|
27.11.2005
|
I finally did it, and ordered via fax the empennage kit of my RV-10
|
![]() |
|
2.11.2005
|
Visiting Vans Aircraft at Aurora Airport in Oregon, USA
|
![]() |